Scheme Design - Permitted Development

£750.00

The fastest, most straightforward way to extend your home.

If your extension falls within your statutory Permitted Development rights, you don't need to go through the lengthy full planning process. We produce a complete technical drawing pack designed to confirm compliance and get your project to a design you are happy with. This can then be taken forward using our Building Regulation Technical Pack or under a Building Notice by your Contractor / Builder.

Ideal For:

  • Single-storey rear extensions (up to 3m for semi-detached / 4m for detached)

  • Standard garage conversions & loft conversions

  • Internal structural layout changes & open-plan knock-throughs

What’s Included:

  • Measured Site Survey: Full accurate measurement of your existing home.

  • 2D Technical Drawings: Existing & proposed floor plans, roof plans, Section and elevations.

  • Lawful Development Certificate (LDC) Application: Full preparation and submission to legally prove your project is Permitted Development (if required).

Note: All planning and 3rd Party costs are not included

The fastest, most straightforward way to extend your home.

If your extension falls within your statutory Permitted Development rights, you don't need to go through the lengthy full planning process. We produce a complete technical drawing pack designed to confirm compliance and get your project to a design you are happy with. This can then be taken forward using our Building Regulation Technical Pack or under a Building Notice by your Contractor / Builder.

Ideal For:

  • Single-storey rear extensions (up to 3m for semi-detached / 4m for detached)

  • Standard garage conversions & loft conversions

  • Internal structural layout changes & open-plan knock-throughs

What’s Included:

  • Measured Site Survey: Full accurate measurement of your existing home.

  • 2D Technical Drawings: Existing & proposed floor plans, roof plans, Section and elevations.

  • Lawful Development Certificate (LDC) Application: Full preparation and submission to legally prove your project is Permitted Development (if required).

Note: All planning and 3rd Party costs are not included